Sammamish River bridge project still delayed by right-of-way issues

This content is for subscribers only. Log in or sign up for a free trial below.

Photo by Briana Gerdeman. The city plans to widen or replace the bridge on SR 202 over the Sammamish River, but it’s having a hard time getting right-of-way from the Port of Seattle, which controls the railroad.


Dave Thompson 300x250